Central Weber Sewer Improvement District
Location: Ogden, UT
Contract Amount: $12.4 Million
Work consisted of building a new process building, 1MG freshwater reservoir and new electrical building for the existing intake pumps on shore line of Starvation reservoir.
Work consisted of building a new process building, 1MG freshwater reservoir and new electrical building for the existing intake pumps on shore line of Starvation reservoir. It also included solid drying beds and diversion vaults and a 750kW backup generator with ATS control. Work consists of new 600v ductbanks, PVC coated rigid steel conduit. All power and lighting install, Installation of soft starts VFDs and MCCs and Installation of PLCs and all power and control and instrumentation wiring associated with the control logic and SCADA.